We maintain and optimize codebases for reliability, performance and security. We execute metrics driven refactors, keep dependencies up to date, speed up load times and raise quality with tests and CI/CD. You get full visibility and less technical debt.
Safe refactors guided by metrics and review.
Up to date dependencies with risk control.
Continuous quality with testing and automation.
Scope: Laravel, Vue.js, PHP, JavaScript, Composer and NPM, database migrations, queues and jobs, front assets, API and controllers, repos and branches, CI/CD pipelines, secrets and environment config.
Metrics: test coverage, cyclomatic complexity, module hotspots, bundle size, p95 latency, queries per request, cache use, green build ratio, cycle time and defects per deploy. Dashboards show trend and impact.
Alerts for package vulnerabilities, licenses, deprecations, build failures, slow flows, error endpoints and performance regressions. Ticket integration and priority by impact.
Continuous improvement
Audit
Map modules, technical debt and risks. Quick wins and iterative plan.
Refactor
Patterns and simplification with tests, no visible behavior change.
Measure
Validate impact on performance, errors and delivery time with KPIs.
Every change is tracked end to end: analysis, decision, PR, tests, deploy and result.
Automation
CI/CD with tests, lint and security on each commit.
Architecture guides, ADRs, patterns, API contracts and team contribution checklist.
Operational KPIs
Metric
Target
Current
Comment
Test coverage
>= 80%
86%
Critical paths covered
Time to merge
<= 24 h
10 h
Small PRs and fast reviews
Defect rate
<= 0.2%
0.09%
Regression controlled by tests
Green builds
>= 95%
98%
Stable and fast pipeline
Bundle size
<= 300 KB
240 KB
Split and cache effective
Summary
Healthy and fast code lowers risk and cost. With metrics guided refactor, safe dependencies, testing and CI/CD, we achieve fewer incidents, stable builds and shorter delivery times, with end to end transparency for business and teams.
Want a quick repo review? We deliver a priorities report and improvement plan in two weeks.